Module code: WIBASc-525-625-Ing1 |
|
1U+1P (2 hours per week) |
3 |
Semester: 6 |
Mandatory course: no |
Language of instruction:
German |
Assessment:
Project work
[updated 02.07.2019]
|
WIBASc-525-625-Ing1 (P450-0036) Industrial Engineering, Bachelor, ASPO 01.10.2013
, semester 6, optional course
|
30 class hours (= 22.5 clock hours) over a 15-week period. The total student study time is 90 hours (equivalent to 3 ECTS credits). There are therefore 67.5 hours available for class preparation and follow-up work and exam preparation.
|
Recommended prerequisites (modules):
WIBASc-535 Introduction to Scientific Work (with seminar) WIBASc245 Manufacturing Engineering
[updated 11.02.2020]
|
Recommended as prerequisite for:
|
Module coordinator:
Prof. Dr.-Ing. Dieter Arendes |
Lecturer: Prof. Dr.-Ing. Dieter Arendes
[updated 11.02.2020]
|
Learning outcomes:
After successfully completing this module students will: _ be able to systematically and comprehensibly plan production for (new) products, including the essential technical (machines, tools, production processes, time schedules and number of employees) and economic aspects (investments, production costs), i.e. students will _ be able to create a production parts list and a process graph from a product. _ be able to develop a production concept with estimates of employee requirements and investments. _ be able to create a layout for a one-piece-flow assembly line and build it as a 1:1 model, as well as to transfer this into a concept for total production. _ be able to estimate the necessary investments and staff capacities.
[updated 02.07.2019]
|
Module content:
Based on a specific product, e.g. drilling machine, jigsaw, orbital sander, a production plan will be created: _ Component analysis with parts list and decision regarding in-house/external production _ Creation of a process graph, production concept with time specifications and individual investments _ Creation of a layout for a chaku-chaku line with a high manual part _ Planning the production for a multi-year quantity scenario _ Calculation of production costs If industrial partners are available, their existing production lines will be analyzed and replanned.
[updated 02.07.2019]
|
Teaching methods/Media:
The following types of media will be used during the seminar: Projector, slides, laptop, sample components, blackboard, daylight recorder, etc. Planning will take place 1 to 1 in the model factory with mobile assembly tables, including assembly tools and devices. Results will be presented and discussed in several groups.
[updated 02.07.2019]
|
Recommended or required reading:
_ Meran, R., John, A., Staudter, C., Roenpage, O., Lunau, S.: Six Sigma+Lean Toolset, Mindset zur erfolgreichen Umsetzung von Verbesserungsprojekten, Springer-Verlag Berlin Heidelberg, 2012 _ Erlach, K., Wertstromdesign: Der Weg zur schlanken Fabrik, Springer-Verlag Berlin Heidelberg, 2010 _ Brunner, F.J., Japanische Erfolgskonzepte, Hanser- Verlag, 2011 _ Rother, M., Die Kata des Weltmarktführers, Campus Verlag, 2009 _ May, C.; Schumek, P., TPM _ Total Productive Management, CETPM Publishing, 2009 _ Dickmann, P., Schlanker Materialfluss, Springer-Verlag, 2007 _ Takeda, H., Das synchrone Produktionssystem, Verlag Moderne Industrie, 1995 _ Westkämper, E., Null-Fehler-Produktion in Prozessketten, Springer-Verlag, 1997 _ Shingo, S., Poka-Yoke, gfmt-Gesellschaft für Management und Technologie, 1991 _ Shingo, S., Das Erfolgsgeheimnis der Toyota Produktion, Verlag Moderne Industrie, 1993 _ Womack, J. P., Jones, D. T., Auf dem Weg zum perfekten Unternehmen, Heyne-Verlag, 1998 _ Eversheim, W., Gestaltung von Produktionssystemen, Springer-Verlag, 1999
[updated 02.07.2019]
|